Purpose
Specify the Scenarios that determine when the Task is performed.
How to… Activate or Deactivate the Scenario that applies to a Task
1. Click the Labour and Scenarios button in the toolbar on the edit window.
The Labour and Scenarios for Asset Task or Asset Type Task window opens.
2. Select the Scenarios tab
3. Select the Scenario to be activated or deactivated.
4. Double-click on Active to change its setting.
5. Save the record.
Data fields
These data fields are captured or displayed on the Scenarios for Asset Type Task or Asset Task window.
Field |
Description/Setting |
Development Status |
The development status of the Scenario for Standard Task linked detail record. |
Inheritance Type |
The Inheritance Type indicates how the Scenario for Task linked detail record came into existence. Possible values are “Original” or “Inherited”. |
Active |
Ticked if the Scenario for Standard Task linked detail record is active. |
Scenario |
The code and description for a Scenario. |
Interval |
The Interval for Calendar based and Usage based Tasks is updated when the Task’s (Task) Interval Type is changed. |