![]() |
![]() |
If changes are made to a work order after an SLA has been assigned, the criteria of the assigned SLA will be re-evaluated when the work order is saved. This will then result in one of the following actions:
Note:
The “new” SLA must be within its main measure range to be applied.
Suppose the following two SLAs exist:
If you have created a work order with the Importance as 'HIGH', SLA1 will be assigned. However, if you then make a change to the importance of the work order, the following changes could occur:
|