Modify Components in an Asset model
Purpose
Edit or modify an Asset Component’s details.
Before you start
How to… Modify a Component's details in an Asset model
1. Open the Asset Tree window.
2. Expand the Asset Tree to the required level.
3. Double-click on the required Component.
The Component edit window opens.
4. Click the required tab and change the details.
Header
Details
Notes, if applicable.
5. Save the record.
6. Change the Failure Analysis linked detail records for the Component.
As a result...
- The Asset Component’s Development Status does not change.
- Accept development of the Asset Component.
-
- If Apply to Children is ticked then changes are accepted for the Component’s child items and its linked detail records.
- The Asset Component’s Development Status changes to “Confirmed”.
Please note!
- If the Sort Order parameter on the Tree Display Options window is set to “Sequence Number” then a Component’s Sequence Number determines its sequence on the same level and with the same parent in the Asset Tree. Use the Sequence Number to view the Components in a logical sequence.
© 2016 Pragma